Boilermakers Local 128 Union Hall and Training Facility

Project Type:

Assembly, Training, New Construction

Year:

2022

Square Feet (Meter)

Up to 17,000 sq ft (1,580 sm)

The new facility will serve not only as a modern home for the Boilermakers Local 128 team, but also as the training facility for in-demand Boilermakers and Welders throughout Canada.

Placed upon a stepped site, this building will be a strong visual landmark in the community, bringing long overdue recognition to Boilermakers and the role they continue to play in our modern age.

Housing front offices, training rooms, a state-of-the-art welding facility, and more, this building will be a much sought-after training centre for new tradespeople throughout the province.

Centreline Architecture

158 Elgin Street, Suite 201

Sudbury, ON P3E 3N5

Phone: 1-705-618-1767

Email: info@c-arch.ca

Arriving:

When coming to our office, street parking is offered through HOTSPOT or the municipal lot across from our office. We are the double doors on the left face of the building, a buzzer is available to get our attention when you arrive.

Careers:

Centreline Architecture doesn’t currently have any openings however if you are an architect, interior designer, technologist, or student, please do get in touch via email with a pdf resume and portfolio so we can keep you in mind for the future.